Site readiness

Three steps before delivery day

01

Prepare the surface

Place the container on firm, level ground such as compacted gravel or pavement. Soft soil or sloped ground can shift the unit during offload.

02

Clear the approach

Confirm a straight route for the truck with room for turning, plus clearance under power lines and overhead obstructions along the drop path.

03

Set the placement

Mark the final spot and keep the pullout lane open. Tilt-bed trucks need straight-line space matching the unit length to unload safely.

Truck criteria

Access requirements by truck type

Confirm these measurements with your carrier before scheduling delivery.

Tilt-bed

Straight pullout lane

Tilt-bed trailers need a clear straight lane matching the container length, plus space to tilt the bed and slide the unit onto the ground.

Flatbed

Turning radius and road width

Flatbed deliveries depend on the route's turning radius and road width. Share access details so the carrier can plan the approach.

Overhead

Height and line clearance

Check for overhead lines, tree limbs, and gate heights along the route. Clearance must accommodate the loaded truck and container height.